Procurement of Turbine Auxiliaries

SHIN THERMO has proven capabilities in the area of Equipment and System Design, Pressure Vessel and Heat Exchanger Design, Piping Design & Engineering, Electrical & Instrumentation System Design, Project Management, Procurement Services and Field Erection / Commissioning Services.


Generator & Panels  (50 Hz & 60 Hz)
  • Generator
  • AVR panel
  • Control metering protection and Synchronizing panel
  • LAVT Panel
  • NGR panel
Condensing System
  • Surface Condenser
  • Air Ejector
  • Condensate Extraction Pumps
  • Hot well Level control valves
  • Piping
  • Level instruments
Acoustic Enclosure
  • For Individual equipment
  • For Entire Turbine-Generator Set
Lube Oil System
  • Main Oil tank MOP,AOP.COP ,EOP
  • Oil cooler, Oil Filters
  • OHT
  • Oil Purifier (Centrifuge)
  • Interconnecting piping
Reduction Gear
  • Double Helical Single Reduction
  • High and Low Speed Coupling
    (Flexible Spacer type and Gear type)
Miscellaneous
  • Turbine Bypass Station,
    Dump tube & Instruments
  • Safety valves
  • PRDS
  • Counter flanges , Etc
Electricals  (50 Hz & 60 Hz)
  • MCC Panel
  • Generator Circuit Breaker
  • Battery & Battery Charger
  • Cables (LT/HT)
  • Busduct etc
HP & LP Heaters
  • No of LP & HP Heaters
  • Level control station
  • Drain and Vent piping
Piping
  • Design, supply and
    installation for inlet steam,
    extraction steam, condensate water,
    cooling water and pneumatic
    piping along with
    thermal insulation & cover
    and supports within the hall
    of steam turbine -generator set.